Department of Electrical and Computer Engineering George Mason University Volgenau School of Engineering

Project Timeline

  • 02/07 Draft Project Specifications Due
  • 02/21 Project Specifications Due
  • 03/20 -- 03/24 Progress Report
  • 04/25 Project Paper Draft Due
  • 05/02 Project Reviews Due
  • 05/05 Project Presentations
  • 05/09 Final Project Paper Due

Project Resources


Project Grading Criteria

Project Specifications (6 points)

  • Completeness (based on the guidelines)
  • Clarity of main project goals
  • Thoroughness of the literature search

Project Report (20 points)

  • Results (12 points)
    • Working implementation
    • Testing methods
    • Performance
    • Analysis of results
    • Agreement with Theory
    • Practicality
    • Difficulty of the project
  • Documentation (8 points)
    • Introduction
    • Analysis of the papers you read
    • Discussion of the results
    • Figures and tables
    • Conclusions
    • Proper references
    • Paper organization

Project Reviews (4 points)

  • Understanding of the main contributions of the paper
  • Helpfulness of comments to the authors
  • Thoroughness of paper review

Project Presentation (10 points)

  • Content
  • Background
  • Results and Conclusion
  • Organization of the presentation
  • Quality of the slides
  • Discussion of the encountered problems
  • Handling questions
  • Clarity of the presentation
  • Presentation style
  • Timing